UL SAA Certified AC DC Adapter 5V 2A 12V 1A Wall Mount Power Adaptor
Product Description:
Features:
1.Built-in EMI filter
2.100% full load burn-in test
3.Low output ripple and noise
4.Protection:Over load/Over voltage/Short circuit
5.High efficiency,High reliability,Long lifetime












FAQ:
Q1: WAHT'S YOUR MOQ:
A1: Usually MOQ is 500-1000pcs, we also can accept trail order to support new customers.
Free samples are also provided
Q2: WHAT'S YOUR WARRANTY?
A2: 2-3 years warranty.
Q3: HOW ABOUT THE LEADING TIME?
A3: For samples, leading time is 3-5 working days.
For mass cargo, leading time will be 15-20 working days.
Product Description:
Features:
1.Built-in EMI filter
2.100% full load burn-in test
3.Low output ripple and noise
4.Protection:Over load/Over voltage/Short circuit
5.High efficiency,High reliability,Long lifetime
Specifications | |
Model No. | IC-1801500 |
DC cord | 1.2m / 1.5m / 1.8m |
DC jack | USB, 5.5 x 2.5, 5.5 x 2.1, 3.5 x 1.35, 4.1 x 1.7, micro 5pin |
AC plug | US UK AU EU KR IN etc |
AC Input | |
Input current | 1.5AMax |
Input Voltage Range | 100-240V |
Input Frequency Range | 47/63Hz |
DC Output | |
Output Voltage Range | 12V |
Output Current Range | 3A |
Output Power | 36WMax |
Environment | |
Operating Temperature | 0°C ~40°C |
Protection | |
Over Current Protection | Yes |
Short Circuit Protection | |
Over Temperature Protection | |
Over Voltage Protection | |
Certificates | |
UL | |
Terms and Conditions | |
Unload standly power | 0.1W Min |
AC leakage Current | 0.25mA Max |
DIELECTRIC STRENGTH Hi-Pot | 3000Vac/5mA/5s |
Insulation resistance | 10MΩMin at 500V DC |
Surge | 2KV |
SAFETY STANDARD | UL60950,IEC60950,UL60065 |
EMC STANDARD | EN55020/EN55024 |
Delivery date | 18 days for mass production, 3-5 days for samples |












FAQ:
Q1: WAHT'S YOUR MOQ:
A1: Usually MOQ is 500-1000pcs, we also can accept trail order to support new customers.
Free samples are also provided
Q2: WHAT'S YOUR WARRANTY?
A2: 2-3 years warranty.
Q3: HOW ABOUT THE LEADING TIME?
A3: For samples, leading time is 3-5 working days.
For mass cargo, leading time will be 15-20 working days.